As-Applied vs Prescription
A stepped prescription profile and the lagged as-applied trace hold still while the signed residual bars between them are drawn back toward the zero rule in a reconciliation wave.
A stepped prescription profile and the lagged as-applied trace hold still while the signed residual bars between them are drawn back toward the zero rule in a reconciliation wave.
Three multispectral planes of the same tile lattice drift out of register against fixed corner crosshairs and slide back into one composite index raster.
Four rigs run the same permanent tramlines down the field and back, keeping the compacted lanes compacted while the beds between them are never driven on.
Parallel AB guidance lines fill the field while a single applied swath travels the active line and a lightbar pip wanders off the centre rule and is steered back to zero cross-track error.
A recorded field boundary is walked by a marker while the headland ring offset inside it is re-cut by an arc travelling its own shorter perimeter.
Three rectilinear management zones are cut out of a soil sample grid, each boundary re-walked by an accent arc travelling its own perimeter.
Nested vegetation-index isolines around two vigour centres breathe outward in a ripple while a marker tracks the field mean along the index ramp.
Sixteen pulse-width nozzles hold a uniform duty on the straight, then turn compensation fans them out so the inner nozzles throttle down while the outer ones open up.
Double-covered patches light up where each pass crosses the headland run, then section control wipes them away one by one until the coverage map abuts cleanly.
The commanded rate steps at each zone boundary and the delivered-rate trace lags behind it until lookahead compensation pulls the whole curve back onto the step.
A boom of twelve individually keyed sections crosses an angled field edge and each section shuts its nozzle in turn as it passes outside the applied boundary, then re-opens behind it.
A conductivity sled runs a serpentine transect across the field and each sample cross switches on exactly as the sled reaches it, filling the survey grid one leg at a time.
Coverage is laid down swath by swath across a field outline in serpentine order, each band flaring as it is applied then settling to recorded coverage while the oldest band clears.
A prescription grid of per-cell rate bars, each baked to its management zone's tier, dips and rebuilds in a re-prescription wave that crosses the field column by column.
A harvest front crosses a yield grid at constant speed and every column it clears records its own yield as one, two or three hatch strokes behind it.